Cable and pneumatic routing in pick-and-place gantries
A routing brief for an overhead handling gantry should identify the equipment connections and the space in which they must be coordinated. Show the robot and tooling relationship, conveyor height, guarding and required service access in the same arrangement. Record equipment-specific routing requirements before selecting structural details around them.

BEFORE THE DESIGN REVIEW
Key takeaways
- Locate robot, tooling and adjacent equipment interfaces in the gantry layout.
- Collect equipment-specific cable and pneumatic requirements from their suppliers.
- Review routing together with guarding, cleaning and service access.
- Identify which connections belong to the supplied scope and which remain external.
Which equipment interfaces should the routing review cover?
Vertex SynTech’s pick-and-place gantries are designed around the robot envelope, tooling, conveyor height and access requirements. They can integrate with guarding, conveyors, vision systems and service access, making routing part of a coordinated cell-layout discussion.
The pick-and-place gantry capability describes overhead supports for robotic handling. Begin the routing brief with the actual equipment list and identify the connections requiring coordination. A general gantry outline does not describe those interfaces.
Mark which robot, tool, conveyor or vision equipment has already been selected and which items remain under discussion. This suggested notation keeps confirmed connection information separate from assumptions made during concept development.
What cable and pneumatic information should be requested?
Cable and pneumatic routing are explicit inputs in Vertex SynTech’s support-structure design considerations. The brief should identify the equipment connections, the information available from the suppliers and any routing constraints that still require confirmation.
Ask the responsible equipment suppliers for the requirements relevant to their connections and installation. Record those requirements with the corresponding equipment identifier. Where details are unavailable, retain an open question rather than drawing a route that appears plausible but has no confirmed basis.
This guide does not assign bend radii, cable sizes, pneumatic pressure or moving-route limits. The source material establishes routing as an integration input, not a universal routing specification. The design conversation should use information applicable to the actual equipment.
How should routing be reviewed with access and cleaning?
Gantry design includes service access, and support-structure requirements include cleaning, hygiene zones and removable sections. Proposed cable and pneumatic routes should be reviewed with those tasks and interfaces in the same equipment arrangement.
Mark the positions people need for inspection, maintenance and cleaning. Identify whether a proposed route meets a service opening, removable section or equipment interface that needs further coordination. These are review questions; the final details depend on the equipment and project requirements.
The operator-access guide and washdown brief explain those inputs. Stainless or painted construction is selected in relation to the operating zone, while routing and access still need their own layout review.

How do pedestal and gantry routing scopes relate?
Vertex SynTech’s robot pedestal capability can incorporate cable and pneumatic routing into the pedestal or surrounding structure. An overhead gantry has a different support arrangement, so a new brief should identify which parts of the routing belong to the selected support and which connect to other equipment.
The pedestal image illustrates a related support family, not a claim that the pictured unit is part of an overhead installation. Use the pedestal enquiry guide where the proposed support is pedestal-mounted and the gantry capability where overhead support is being considered.
For either arrangement, keep supply responsibilities explicit. Identify the interfaces supplied by the robot vendor, the structure supplier and the existing installation. Ask which party needs to confirm each connection rather than allowing the route to fall between separate equipment scopes.
Prepare an interface register for the design review
A routing register can connect each equipment interface to the available supplier information, proposed layout and unresolved requirements. The checklist below is a suggested coordination tool for the enquiry and 3D review.
Use the same equipment identifiers in the route notes and model. This makes it easier to locate a question during review and to see which connection may be affected by a changed robot or conveyor position. Record the status of the information rather than presenting preliminary routing as an approved installation detail.
The 3D model approval guide provides the wider decision checklist. Required routing information should remain associated with the model revision being reviewed, especially where equipment selection or service access is still changing.
| Information to provide | What the review needs to resolve |
|---|---|
| Connected equipment | Robot, tooling, conveyor, vision or other interface to coordinate |
| Supplier information | Available connection details and equipment-specific constraints |
| Layout relationship | Proposed positions, operating envelope and structural interfaces |
| Access and environment | Service tasks, cleaning zone and removable sections affected |
| Scope responsibility | Supplied connections and external installation interfaces |
| Open decisions | Missing information and the next confirmation required |
What should be sent with the routing enquiry?
Send the cell layout, selected equipment information and the cable or pneumatic interfaces requiring review. Identify which details are fixed, which remain preliminary and whether the enquiry covers structure design, controls or wider cell integration.
The robotic handling capability provides the integration context. For control requirements, the automation-brief guide helps describe the intended operation independently of the physical route.
Vertex SynTech can discuss the support and surrounding equipment using those inputs. A clearly identified connection and open question is a useful starting point even before every routing detail has been confirmed.