VERTEX SYNTECH / PROJECT APPROACH

From project brief to installed equipment

The project approach links the initial brief, technical definition and customer approval with equipment manufacturing, delivery and installation.

Talk to our engineering team
Plan and elevation drawings of the frozen food packaging systemENGINEERING + INTEGRATION

A defined engineering sequence

Each stage develops the information needed for the next. The equipment is visualized for customer approval before the final system model and manufacturing documentation.

  1. 01

    Project overview

    establish the application and equipment scope.

  2. 02

    Conceptual design

    prepare 3D rendering and cost estimation.

  3. 03

    PO and technical parameters

    define the project’s technical basis.

  4. 04

    Equipment visualization

    review the 3D equipment model with the customer.

  5. 05

    Final system model

    prepare manufacturing documentation.

  6. 06

    Equipment manufacturing

    fabricate and assemble the agreed equipment.

  7. 07

    Delivery and installation

    bring the equipment into its operating context.

Support structures: layout to fit-up

For structures, site and machine data inform 3D engineering of clearances, stairs, railings, drainage and interfaces. Design for manufacture is followed by cutting, bending, welding, finishing and inspection.

Assembly and installation

The structure workflow includes pre-assembly, dimensional verification and fit-up, followed by packing, transport, installation and final adjustments. Acceptance scope is agreed for the project.

Useful starting information

Provide available equipment drawings, interface dimensions, loads, footprint, required access and cleaning conditions. Identify installation constraints and any removable sections or future changeover requirements.

LET’S DEFINE YOUR NEXT PROJECT

Your equipment. Your process. Our engineering.

Start with the application, the machines and the requirements.

Discuss a project